Risk Management · 2024
In this section4 topics
Risk Management Policy & Plan
Policy & Plan Description
Risk Management Policy
Risk Management is a fundamental element of the Company’s overall management framework. The Company has developed a structured risk management system that is embedded at all levels of the organization, ensuring the identification, assessment and mitigation of risks across its operations. Based on a review and recommendations of Deloitte Touche Tohmatsu Jaiyos Advisory Co., Ltd., employed by the Company for this purpose, the Company has trained its employees in risk management areas and prepared
the Company’s risk management policy, procedures and concepts, which are based on the principles of COSO (Enterprise Risk Management-Integrated Framework, COSO, September 2004) and AS/NZ 4360:2004 (Risk Management-Australian/New Zealand Standard, AS/NZ 4360:2004), thereby ensuring that the Company’s risk management system meets international standards. Regular reviews and updates to this framework ensure that it remains aligned with evolving risks, regulatory changes and industry best practices.
Establishment of the Risk Management Committee
Recognizing the critical importance of risk management in both internal and external business environments, the Company established the Risk Management Committee on 20 February 2013. This committee is tasked with overseeing the implementation and effectiveness of the Company’s risk management policies, ensuring that all potential risks are thoroughly evaluated and mitigated. Working in conjunction with the Risk Management Department, the committee continuously reviews risk exposure and provides timely reports to the Board of Directors, ensuring that the Company remains well-positioned to handle emerging challenges. The full scope of the Company’s risk management policies and procedures is available in the Corporate Governance Policy Manual on the Company’s website.
Continuous Improvement of the Risk Management System
As part of the Company’s commitment to continuously enhancing its risk management framework, the Company is currently in the process of updating its system to align with the COSO 2017 Enterprise Risk Management (ERM) model. This transition aims to further integrate risk management into strategic decision-making, improve risk identification processes and enhance resilience against emerging risks. While this update is being implemented, the Company’s existing risk management system remains robust, ensuring effective monitoring and mitigation of all identified risks.
Policy Document Link
https://cnt-th.listedcompany.com/misc/CG/20240315-cnt-cg-policy-manual-en.pdf
Page Number in Report
21-22
Risk Factors — Overview
Risk Factors — Introduction
Significant Risk Factors Affecting the Company
The Company operates in the construction industry, which is inherently subject to various risks, ranging from market and economic uncertainties to regulatory, operational, and environmental challenges. It is imperative that the Company adopts a dynamic and adaptive risk management approach to mitigate any potential negative impacts on its business. Below are the key risk factors that could significantly affect the Company’s financial performance and operational stability, structured in accordance with the Company’s reporting standards.
Risks to the Company's Business Operations
Risk Register
| Risk Name | Risk Characteristics | Consequences | Management Measures | Related Risk Factors |
|---|---|---|---|---|
| Market Risk | The construction industry is highly sensitive to economic fluctuations. The demand for construction services depends on government budget disbursement, private sector investment trends, and financial readiness. In 2024, stable interest rates and moderate material cost fluctuations, combined with cautious investor sentiment, have delayed project commencements and investment decisions. Pricing pressures and aggressive bidding from competitors in the domestic market may result in lower project margins. In addition, political changes, regulatory adjustments, and market conditions in Myanmar and Cambodia have impacted the Company's foreign operations. | This may result in reduced market demand and project volumes, delays or postponements in new project commencements, challenges in maintaining backlog levels, and lower gross profit margins for highly competitive projects. | The company manages this risk by carefully selecting projects, working with financially stable and reputable clients, maintaining a diversified project portfolio, and closely monitoring clients' readiness and market conditions. This approach ensures preparedness to adjust strategies in response to changing circumstances. | 760 · Other name: Uncertainty in political situations and governance of foreign markets · Description: Other · Info category: COMPLIANCE_RISK · 767 · Other name: Counterparty payment capability · Description: Other · Info category: FINANCIAL_RISK · 1714 · Description: Competition risk · Info category: STRATEGIC_RISK · 737 · Other name: Sensitivity to economic volatility in the construction industry · Description: Other · Info category: STRATEGIC_RISK · 755 · Other name: Maintaining adequate backlog of work · Description: Other · Info category: OPERATIONAL_RISK |
| Construction cost |
| This may lead to increased project costs beyond the budget, resulting in reduced project profit or potential losses. • Project costs exceeding the budget • Impact on the Company’s gross profit margin • Liquidity risk if costs rise sharply | The Company manages construction cost risks prudently by implementing cost control and advance procurement strategies. • Negotiating price adjustment agreements with project owners when price fluctuations exceed predetermined thresholds • Closely monitoring material market conditions and price trends • Planning advance procurement and reserving materials during favorable price periods • Managing costs and adjusting construction plans in line with the situation | 730 · Description: Government policy · Info category: STRATEGIC_RISK · 1724 · Description: Liquidity risk · Info category: FINANCIAL_RISK · 767 · Other name: Risk of cost control deviating from the planned budget · Description: Other · Info category: FINANCIAL_RISK · 737 · Other name: Volatility in construction material prices and labor costs · Description: Other · Info category: STRATEGIC_RISK |
| Availability of Labor and Qualified Personnel Risk | The construction business requires a large workforce and highly skilled personnel, including engineers, supervisors, and skilled labor. In recent years, there has been a continuous labor shortage, especially during the post-COVID-19 economic recovery, leading to rising labor costs. Additionally, there is a risk in retaining talented personnel to remain with the organization over the long term. | This could result in increased labor costs and may affect the ability to deliver projects on time. • Delays in project execution • Increased labor costs • Risk of compromised work quality if skilled personnel are lacking | The Company places emphasis on manpower planning and continuous personnel development. • Planning recruitment in advance • Consistent personnel development and training programs • Engaging subcontractors and maintaining reserve labor for urgent projects • Building employee engagement and career growth opportunities | 755 · Other name: Shortage of skilled labor and personnel in the market, Competition in attracting and retaining capable personnel · Description: Other · Info category: OPERATIONAL_RISK |
| Project Complexity Risk | Large-scale or highly complex construction projects require expert knowledge and meticulous planning. Frequent design changes or mistakes during execution can lead to project delays and increased costs. | This risk affects project timelines, work quality, and project costs. • Construction delays • Risks to project quality and safety • Increased costs due to rework or adjustments | The Company deploys experienced engineering teams to manage complex projects effectively. • Thoroughly reviewing drawings and specifications before commencing work • Carefully planning and ensuring clear coordination among all stakeholders • Utilizing construction management technology to monitor progress and prevent potential issues • Regularly reviewing risks and adjusting plans as situations evolve | 737 · Other name: Complex coordination among multiple parties · Description: Other · Info category: STRATEGIC_RISK · 755 · Other name: Project Complexity Risk · Description: Other · Info category: OPERATIONAL_RISK |
| Interest Rate Risk | The Company is exposed to the risk of interest rate fluctuations, which can affect financial costs. In particular, rising interest rates may increase interest expenses and impact overall profitability. | Higher financial costs and impacts on the Company’s ability to sustain profitability. • Increased interest expenses • Negative impact on the Company’s net profit • Challenges in long-term financial planning | The Company prudently manages interest rate risk through various measures. • Closely monitoring interest rate trends • Negotiating with financial institutions to obtain favorable interest rates • Considering the use of interest rate hedging instruments where appropriate • Managing debt structure appropriately for both short- and long-term obligations | 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK · 767 · Other name: Uncertainty in financial costs · Description: Other · Info category: FINANCIAL_RISK |
| Bad Debts and Overdue Payment Risk | The Company is exposed to the risk of clients delaying or defaulting on payments, particularly in prolonged projects or when clients face financial difficulties. Such situations can impact the Company’s cash flow and potentially lead to bad debt losses. | This risk affects cash flow, working capital management, and may necessitate provisions for doubtful debts, impacting the Company’s financial performance. • Liquidity risk • Increased financial costs from the need for alternative funding • Doubtful debt provisions affecting overall profitability | The Company places great importance on carefully assessing the financial strength and payment ability of clients. • Selecting clients with solid financial standing and reliability • Closely monitoring invoicing and payment schedules • Preparing liquidity management plans and maintaining financial reserves • Utilizing legal measures or collection procedures when necessary | 763 · Description: Default on payment or exchange of goods · Info category: FINANCIAL_RISK · 1724 · Description: Liquidity risk · Info category: FINANCIAL_RISK · 767 · Other name: Delays in invoicing and payment collection · Description: Other · Info category: FINANCIAL_RISK |
| Subcontractor Performance Risk | The Company relies on subcontractors for parts of its operations. If subcontractors lack the ability to perform, deliver poor quality work, or face financial difficulties, it can result in delays, substandard outcomes, and strained relationships with clients. | This risk may lead to project delays, compromised work quality, and damage to the Company’s reputation. • Project delays • Quality issues in completed work • Risk of disputes and damage claims from clients | The Company carefully selects subcontractors with proven experience and reliability and closely monitors project progress. • Selecting highly capable and experienced subcontractors • Establishing clear contractual terms with penalty clauses for non-compliance • Regularly monitoring work progress • Maintaining backup subcontractors for emergency situations | 767 · Other name: Financial difficulties faced by subcontractors · Description: Other · Info category: FINANCIAL_RISK · 755 · Other name: Subcontractor readiness issueso, Lack of quality standards and delays in delivery · Description: Other · Info category: OPERATIONAL_RISK |
| Supply Chain and Delivery Risk | Construction projects rely on continuous procurement and timely delivery of materials and equipment. Delays, shortages, or disruptions in the supply chain can cause project delays and increased costs. | This risk impacts project schedules and costs and can affect client relationships. • Project delays due to material shortages • Increased costs from emergency material procurement • Risk of disputes if project delivery deadlines are missed | The Company manages supply chain risks with proactive planning and contingency measures. • Planning advance procurement of materials • Maintaining key material reserves and sourcing from multiple suppliers to reduce risk • Continuously monitoring market conditions and trends • Close coordination with suppliers and subcontractors | 740 · Description: Shortage or fluctuation in pricing of raw materials or productive resources · Info category: OPERATIONAL_RISK · 737 · Other name: Disruptions in the supply chain due to unexpected events such as war or economic crises · Description: Other · Info category: STRATEGIC_RISK · 755 · Other name: Delays in the delivery of materials or equipment · Description: Other · Info category: OPERATIONAL_RISK |
| Accident and Safety Risk in Construction | Construction work is inherently high-risk for accidents and hazards to life and property. Without adequate preventive measures, it may impact the safety of employees, subcontractors, and third parties, and damage the Company’s reputation. | Accidents can cause physical and financial damage, harm the Company's reputation, and erode client trust. • Serious accidents at construction sites • Medical expenses and compensation costs • Legal claims and liability risk • Damage to the Company's image and credibility | The Company emphasizes safety measures and the cultivation of a strong safety culture throughout the organization. • Conducting regular safety training programs • Strictly inspecting on-site safety compliance • Assigning dedicated safety officers for each project • Preparing and regularly rehearsing emergency response plans • Securing liability insurance related to accidents and damages | 1723 · Description: Legal risk · Info category: COMPLIANCE_RISK · 749 · Description: Safety, occupational health, and working environment · Info category: OPERATIONAL_RISK · 755 · Other name: Accidents occurring at construction sites · Description: Other · Info category: OPERATIONAL_RISK |
| Financial Risks | The Company may encounter liquidity problems if clients or counterparties delay payments beyond the agreed schedule. This is particularly relevant for long-term projects or projects with delayed government approvals and disbursements, which can lead to higher financial costs. | Impacts may include cash flow constraints, increased borrowing, and higher financial costs. • Tightened liquidity • Increased financial expenses • Impact on the Company’s ability to operate smoothly | The Company manages liquidity closely and maintains contingency financial planning. • Planning cash flows and ensuring adequate credit lines • Closely monitoring client payment status • Maintaining financial reserves for emergency situations • Communicating with clients to expedite payment when necessary | 767 · Other name: Cash flow uncertainty,Delays in budget disbursement from government or private sectors,o Late payments from counterparties · Description: Other · Info category: FINANCIAL_RISK |
| Foreign Exchange Risk | Although most of the Company’s business operations are domestic, the import of certain materials or equipment involves foreign currencies. Exchange rate fluctuations can cause actual costs to exceed projections. | This risk may increase project costs and impact the Company’s overall performance. • Increased material costs due to exchange rate volatility • Challenges in maintaining budget control • Risk to project profitability | The Company prudently manages foreign exchange risk through appropriate measures. • Entering into forward contracts for high-value imports • Closely monitoring foreign exchange trends • Planning imports in alignment with market conditions • Considering price adjustments when exchange rate movements significantly affect costs | 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK · 767 · Other name: Increased costs due to currency fluctuations · Description: Other · Info category: FINANCIAL_RISK |
| Counterparty Risk | The Company faces risks if counterparties, including clients and subcontractors, are unable to fulfill their financial or contractual obligations. This could result in delays, operational disruptions, and adverse impacts on the Company’s performance. | Potential project delays, increased costs, and reputational damage if the Company is unable to deliver projects as scheduled. • Delays in project execution • Additional expenses incurred to resolve issues on behalf of counterparties • Reputational risk if project delivery commitments cannot be met | The Company places importance on careful selection and assessment of counterparties’ reliability. • Selecting counterparties with strong financial standing and good track records • Requiring appropriate guarantees or letters of credit where necessary • Closely monitoring the financial status and work progress of counterparties • Preparing contingency plans in case counterparties fail to comply with agreements | 767 · Other name: Risk of counterparties failing to meet financial obligations, Financial difficulties of counterparties affecting project execution · Description: Other · Info category: FINANCIAL_RISK |
| Risk from Changes in Building Codes and Construction Standards | Construction activities are governed by laws and standards that are regularly updated. Changes during project execution or complex requirements may require the Company to adjust its project plans, potentially causing delays and increased costs. | Potential project delays, additional costs, and challenges in meeting project delivery timelines. • Adjustments to designs or work plans to comply with new regulations • Additional costs from rework or modifications • Delays in approvals and project delivery | The Company closely monitors regulatory changes and prepares to adapt accordingly. • Regularly monitoring announcements and regulatory updates • Engaging expert consultants and internal legal teams to review impacts • Planning designs and construction with built-in flexibility • Allocating contingency budgets for required adjustments | 760 · Other name: Changes in laws, regulations, and standards related to construction, Complexity and frequent adjustments of regulatory requirements · Description: Other · Info category: COMPLIANCE_RISK |
| Delays in Construction | Delays in construction can arise from various factors, including the client, subcontractors, or force majeure events such as weather conditions, material delays, and changing legal restrictions. These issues can cause cascading delays in project schedules and impact timely delivery. | Delays may result in the need to accelerate works within limited timeframes, potentially affecting work quality, increasing costs, and leading to disputes with clients. • Increased costs due to acceleration measures • Quality risks from rushed execution • Risk of disputes and claims for damages | The Company prioritizes efficient project management and close coordination with all stakeholders. • Closely monitoring and controlling project schedules • Continuous communication and coordination with clients and subcontractors • Having contingency plans to manage delays and unexpected issues • Maintaining records and documentation to protect the Company’s rights | 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK · 750 · Description: Climate change and disasters · Info category: OPERATIONAL_RISK · 755 · Other name: Design changes or client instructions during construction · Description: Other · Info category: OPERATIONAL_RISK |
| Financial Reporting and Disclosure Risk | The Company places the highest importance on the accuracy, completeness, and transparency of financial reporting and disclosure. Inaccurate or delayed reporting may affect investor confidence and lead to legal repercussions. | Potential reputational damage, loss of stakeholder trust, and legal liabilities. • Loss of confidence from investors and stakeholders • Risk of fines and legal actions • Adverse impact on the Company’s image and reputation | The Company has established a stringent internal control system and engages external auditors to conduct regular audits. • Maintaining strict internal controls and internal audits • Carefully reviewing the accuracy of information before disclosure • Engaging external auditors to audit financial statements regularly • Conducting continuous training and development for personnel involved in reporting and disclosure | 760 · Other name: Accuracy, completeness, and transparency of reported information, Delays or errors in reporting · Description: Other · Info category: COMPLIANCE_RISK |
| Risk from Technological Changes | The construction industry incorporates technologies and innovations to enhance time efficiency, quality, and safety. Examples include 3D building information modeling (BIM) and applications for document management in construction projects. However, technology is evolving rapidly and continuously. While the construction industry is less affected by technological change compared to other industries, readiness to adapt is essential to avoid losing business opportunities and to maintain competitiveness in the market. | Failure to adapt may lead to competitive disadvantages and missed opportunities to improve operational efficiency and reduce costs. • Missed opportunities to develop competitive advantages • Higher costs compared to competitors who adopt more advanced technologies • Lower operational efficiency than achievable standards | The Company encourages and supports personnel to stay updated on technological advancements, participate in professional seminars, and conduct regular study visits. Additionally, the Company has established a dedicated working group of experts to monitor, test, analyze, and evaluate the application of new technologies for business suitability and to report to senior management to ensure timely responses to technological changes. | 732 · Description: Changes in technologies · Info category: STRATEGIC_RISK · 737 · Other name: Risk of failing to adapt to new technologies · Description: Other · Info category: STRATEGIC_RISK |
| Cybersecurity Threat Risk | Modern business operations rely heavily on technology and communication systems, including online transactions. Cyber risks generally involve data breaches, data theft, or destruction of critical information that can disrupt business operations. The Company is therefore exposed to cybersecurity threats that could compromise sensitive financial data or disrupt both internal and external communications. Examples of such risks include ransomware, data leaks, phishing, malware, viruses, and Trojans. | Potential leakage of critical information, system damage, financial losses, and reputational harm. • Disruption of communication and operational systems • Compromise of sensitive data and trade secrets • Reputational damage and loss of trust from partners and clients | The Company invests in cybersecurity systems and continuously builds awareness across the organization. • Installing firewall systems to control and monitor data access • Using antivirus software and secure email services from trusted providers • Applying cloud computing technology in combination with tape backup systems • Conducting employee training and sharing cybersecurity knowledge to enhance awareness and understanding of cyber risks within the organization | 744 · Description: Information security and cyber-attack · Info category: OPERATIONAL_RISK · 755 · Other name: Data breaches or damages caused by malware and viruses · Description: Other · Info category: OPERATIONAL_RISK |
| Sustainability Performance Indicator Risk | The increasing pressure from stakeholders, regulatory bodies, and clients regarding sustainable construction practices presents both opportunities and risks. Failure to comply with environmental standards or adapt to green building requirements may limit the Company’s eligibility to participate in certain project tenders and negatively impact its reputation. | Potential loss of business opportunities and damage to the Company’s trust and brand credibility. • Ineligibility to participate in projects with mandatory sustainability criteria • Loss of competitive advantage • Damage to the Company’s reputation and corporate image | The Company has adopted sustainability performance indicators and integrated environmental considerations into its procurement processes and construction methods to align with evolving expectations. • Applying sustainability criteria in subcontractor selection and material procurement • Developing environmentally friendly construction practices • Closely monitoring changes in sustainability-related regulations • Consistently communicating sustainability policies to employees, subcontractors, and business partners | 760 · Other name: Environmental requirements and sustainability-related legal obligations, Green building requirements that may become mandatory in project tenders · Description: Other · Info category: COMPLIANCE_RISK |
| Workforce and Labor Transformation Risk | As technology is increasingly adopted in construction processes, there is a growing need for new skill sets in digital project management, automation, and sustainable engineering. Failure to attract and develop such talent may hinder the Company’s ability to remain competitive and grow in the future. | Potential impacts on competitiveness, business growth, and the ability to deliver projects to the required standards. • Shortage of personnel with essential skills • Missed growth opportunities • Risks to project quality and efficiency | To mitigate this risk, the Company is investing in targeted recruitment efforts, specialized training programs, and partnerships with academic institutions and industry collaborators to secure and build a future-ready workforce. • Developing recruitment strategies aligned with new skill demands • Providing continuous training and talent development programs • Establishing collaborations with educational institutions and industry partners • Long-term human resource planning to prepare for workforce shifts | 755 · Other name: Demand for new skill sets driven by technological advancement, Challenges in attracting and developing capable personnel · Description: Other · Info category: OPERATIONAL_RISK |
| Specific Risks of the Renewable Energy Business of the Subsidiary (CNES) | 1) Risk from rapid and sudden increases in the price of key materials Nature of Risk: Solar panels and inverters are critical components. Price fluctuations can result in higher-than-anticipated costs and affect the future returns of projects 2) Funding source risk Nature of Risk: Developing power generation facilities requires significant capital investment. If the Company cannot secure adequate funding, project execution may be affected. 3) Counterparty risk Nature of Risk: Long-term PPA agreements, extending over 12 years, carry the risk that counterparties may not consistently meet their monthly payment obligations. | 1) Risk from rapid and sudden increases in the price of key materials Risk Impact: • Increased project costs • Reduced project returns • Impact on competitive pricing ability 2) Funding source risk Risk Impact: • Project delays or disruptions • Negative impact on long-term business expansion plans • Risk of reduced investor confidence 3) Counterparty risk Risk Impact: • Cash flow uncertainties • Risk of payment defaults • Impact on the subsidiary’s recurring income stream | 1) Risk from rapid and sudden increases in the price of key materials Risk Mitigation Measures: The subsidiary (CNES) addresses this risk by promptly securing orders for key materials upon project award and entering into forward currency contracts to hedge foreign exchange risks. 2) Funding source risk Risk Mitigation Measures: The Company maintains strong relationships with financial institutions and benefits from increasing interest from banks to finance high-growth renewable energy projects. 3) Counterparty risk Risk Mitigation Measures: The subsidiary (CNES) manages this risk by carefully assessing the creditworthiness of potential clients and engaging only with well-established clients with strong reputations. | 737 · Other name: Volatility in the price of key solar energy materials, Funding source risks, Counterparty risks related to long-term contracts · Description: Other · Info category: STRATEGIC_RISK |
Risks to Securities Holders' Investment
Risk Register
| Risk Name | Risk Characteristics | Consequences | Management Measures | Related Risk Factors |
|---|---|---|---|---|
| Operational and Management Risks | Major shareholders holding more than 50% of the Company’s outstanding shares can dominate resolutions at shareholder meetings. This may limit the ability of minority shareholders to effectively counter or review key resolutions. | • Minority shareholders lack the power to challenge or review decisions • Risks to transparency and fairness in corporate governance | • Strict adherence to good corporate governance principles and SET regulations • Involvement of the Audit Committee and independent directors in reviewing significant proposals • Ensuring that interested parties abstain from decision-making processes | 2969 · Description: Risk of the company having a majority shareholder holding > 50% of shares · Info category: HOLDER_RISK |