Overview of Operations
Overview of Operations
Overview of tenders and awards in 2025
In 2025, the Company participated in the tendering of 50 projects, with a total tendering value of THB 50,669 million. Of these, 41 projects with a total value of THB 32,710 million had finalised tendering results. The Company was awarded 17 projects with a total contract value of THB 20,336 million. The ratios in terms of number of projects and tendering value were 2.4:1 and 1.6:1, respectively.
In 2025, the Company participated in tendering for several large-scale projects, which will require continuous tendering periods, with tendering results to be progressively finalised going forward. There are still several more projects that will be finalised in 2026. In particular, the Data Centre business segment will result in a significant material positive change and will increase the Company’s backlog for 2026 and the following years.
Market Situation, Competition and Direction in 2026
Projects from both the public and private sectors remain slow and continue to be a matter of concern for contractors in the construction business. For public sector projects especially, there is still a lack of continuity in both policy and investment, which will need to wait for progress following the formation of a new government. In this regard, the Company anticipates that public sector construction projects are expected to continue in the second half of 2026.
Certain private sector projects continue to develop continuously, while others have experienced delays relative to their original investment plans. Examples of these projects include warehousing storage management work, liquid bulk terminals, data centre work, and liquefied natural gas storage stations and control centre work.
In 2026, the Company intends to focus on working on projects selected in the previous year and will endeavour to secure those projects that have been continuously bidded on, which will lead to being awarded the work officially.
Currently, the Company has a robust backlog exceeding THB 20,000 million and has an aggressive plan to expand its backlog towards a targetted THB 30,000 million by end of 2026. In this regard, the Company has prepared a strategic plan for the systematic evaluation and selection of high-potential target projects. To support this expansion, the Company has prepared its human resources and expert teams to ensure that it can efficiently support the commencement of operations on new projects, while maintaining delivery quality according to the Company's standards.
Thailand Solar Market Analysis
Thailand’s solar energy market continued to demonstrate steady progress of that market in 2026, supported by sustained corporate renewable energy demand and policy direction aligned with the country’s long-term decarbonisation objectives. The new draft Power Development Plan (PDP), which remains under review and refinement, continues to indicate a structurally expanded role for renewable energy toward 2037, although clarity on final capacity allocations and official implementation timelines is still awaited.
That Policy direction remains focused on decentralisation and community-level electricity generation. Under the “People’s Solar Programme,” the Ministry of Energy continues to advance four key approaches contributing toward the national Net Zero strategic plan:
community solar farm projects (≈1,500 MW),
solar water-pumping systems for agriculture (≈1,200 projects),
tax incentives measures for approximately 90,000 household rooftop systems, and
floating solar cell projects at three major hydropower dams (≈1,638 MW). This signals expansion beyond commercial / industrial establishment rooftops into household, agricultural, and community-level segments.
The 2,000 MW Direct PPA / Third-Party Access (TPA) pilot programme approved by the National Energy Policy Council (NEPC) continues to progress. Commercial operations are expected to commence in early to mid-2026, subject to finalisation of wheeling charge mechanisms, settlement protocols, and related regulatory guidelines. Corporate interest in private PPA structures remains strong in anticipation of future market liberalisation.
During the quarter, the Energy Regulatory Commission (ERC) announced a temporary suspension on permitting approvals for non-rooftop (ground-mounted, floating, etc.) private PPA projects pending issuance of revised regulations. While this may delay some work development in the short term, rooftop solar and conventional EPC projects can still continue to proceed. In addition, there is a positive development from the enactment of Ministerial Regulation No. 72 (2025) issued pursuant to the Building Control Act B.E. 2522, rooftop solar installations weighing not more than 20 kg per square metre are now exempt from building modification permit requirements, which will help operations proceed more quickly. The Company continues to monitor regulatory and policy developments closely and remains ready to adapt to changing regulations and policies going forward.
Corporate decarbonisation commitments remain a key demand driver for onsite solar installation and private PPA contracting, alongside focus on long-term electricity cost management. However, global supply-chain developments, including industry dynamics in China aimed at reducing aggressive price competition, have begun to result in increases in solar module pricing compared to prior lows. In addition, grid capacity constraints and permitting timelines in certain provinces continue to influence project implementation schedules. Overall, Thailand’s solar energy industry remains an attractive long-term growth market, and CNES remains focused on disciplined expansion across both EPC work formats and PPA-driven projects.
CNES (Subsidiary Company: Alternate Energy Solutions Business)
CNES and its subsidiary, CNESD1, are engaged in the development and management of solar power projects. They provide services by offering various energy solutions that include Power Purchase Agreements (PPAs) and comprehensive engineering services, including turn-key engineering, procurement and construction (EPC).
In Q4 of 2025, CNESD1 has been awarded a solar electricity generation system installation project under the PPA model with a large company in manufacturing industry. CNESD1 is also in advanced negotiations for an additional PPA project with a well-reputed large natural rubber producing and exporting company.
As for CNES, it has been assigned to undertake an EPC project for a leading medical industry company. CNES is also in the final stage of negotiations for two additional EPC projects with a medical business operator and a leading medical solutions service provider company.
In Year 2025, CNES and CNESD1 expanded their commercial and industrial solar portfolio through PPA and EPC projects, strengthening their development and execution capabilities. U.S. tariff measures introduced from Q2 contributed to supply chain volatility and delayed final investment decisions for certain clients with U.S. exposure. Later in the year, supply-side measures in key manufacturing markets, including China, led to higher PV panel prices, increasing project capex. Notwithstanding these factors, CNES & CNESD1 progressed their pipeline and maintained steady execution, positioning the companies for continued growth in FY2026.
For FY2026, the Company is currently preparing proposals and pursuing opportunities for new work across more than 15 projects, covering leading client groups in various industries such as pharmaceuticals, chemicals, medical, retail, agriculture, F&B, and services and tourism.
CNDCM (Subsidiary Company: High-end Hotel and Resort)
Currently, Christiani and Nielsen DCM Co., Ltd. (CNDCM) observes that Phuket’s property market is beginning to adjust toward normalisation after passing through a period of intense growth following the pandemic situation. In 2025, demand began to slow down, longer decision periods, and more price negotiation, while new supply kept rising, creating oversupply in some areas.
However, the fundamental demand factors from high-end buyers from around the world still exist, but the market will give importance to disciplined developers who cut costs and differentiate products. CNDCM expects that 2026 will be a restructuring year, a sorting of winners and losers to screen for operators who truly have potential in the market.
Performance Overview
In Q4 2025, CNDCM made the following progress and changes in its main projects:Top of Form
The high-end residential project at Layan Beach (condominiums and villas): Overall Progress is approximately 82% completed as of the end of 2025. Most of the work under the contract was suspended and scope of work was cut due to prolonged disruption. CNDCM is proceeding with the balance of work to completion and concurrently negotiating claims according to the rights under the Contract. Project is expected to be completed in May 2026.
The luxury hotel project at Nai Harn Beach (site preparation and landslide prevention work): Site Preparation & Soil Stabilisation was completed in November 2025. Piling Works were completed in December 2025. However, since the tender value for the Main Works was higher than the budget set by the employer, the Main Contract has not yet been awarded.
Regarding total revenue throughout 2025, CNDCM generated revenue of THB 290 million, which was lower than the budgeted estimate set at THB 600 million, with a variance of THB 310 million. The main cause was the high-end residential project at Layan Beach, which had major design changes and partial work suspension. This also includes the luxury hotel project at Nai Harn Beach and other private island projects where the main contract work was delayed or suspended due to the tender values exceeding employer’s Budgets.
Conclusion
Although short-term performance has been significantly affected due to external factors, whether from delays caused by design modifications by the designer, suspension of some major work, and the employer's project postponement, combined with increased competition from contractors in Bangkok Metropolis who have begun to expand into the Phuket market more, the Company still remains focused on disciplined bidding.
The Company has set a target for the award of one major large project in Q1 and a second project in Q2 of 2026, with a total revenue target for next year set at THB 575 million, under a strategy of risk management and maintaining quality standards in the luxury real estate market.
Operating Results & Financial Condition
Operating Results & Profitability
Financial Performance
The consolidated financial statements of the Company and its subsidiaries for the year ended December 31, 2025, reported a net profit of THB 56.2 million. This represents an increase of THB 19.2 million compared to a net profit of THB 37 million in the same period of the previous year. This growth was primarily driven by a THB 1,339.3 million increase in construction revenue, rising from THB 5,988.6 million in the prior year. Consequently, total operating revenue grew by THB 1,358.5 million, or 22.3%, in line with the expansion of construction activities. Furthermore, gross profit increased by THB 160.5 million, representing a 68% growth, while the gross profit margin improved to 5.3% from 3.9% in 2024. One big reason for the improved gross profit margin is the recovery of claims vide successful negotiated settlements with the Employers on certain Projects and a favourable Arbitration Award on another Project. This margin expansion was also attributed to several other operational factors in terms of better Construction Management of the Projects, particularly those Projects where the Scope of Company’s Works included Design. Another reason was the strategic utilization of the Company’s in-house workforce for steel structure and fabrication works which met pre-agreed quality and standard requirements, which were successfully executed within the Company’s own steel fabrication facilities as against getting the same works by third party subcontractors.
Other income amounted to THB 7.4 million, representing a decrease of THB 73.9 million compared to 2024. This significant variance was primarily due to a one-time item recorded in the previous year: the reversal of allowance for doubtful accounts totalling THB 49.6 million, following the transfer of land as debt settlement from a long-overdue receivable.
Administrative expenses in 2025 increased by THB 29.6 million, or 9.7% compared to 2024. This rise was mainly attributed to increased headcount to support the expansion of construction activities and the growth in total revenue.
However, interest expenses decreased by THB 25.4 million compared to 2024, resulting from a reduced requirement for working capital and asset investment financing. Additionally, deferred income tax expenses decreased by THB 3.9 million in 2025. Consequently, the Company reported a net profit of THB 56.2 million, an increase of THB 19.2 million from a net profit of THB 37 million in the prior year.
The sales and service segments operated by a subsidiary in Thailand, providing solar, wind and other renewable energy solutions, generated THB 103 million in total revenues from sales and service in 2025, and incurred a net loss of THB 26 million.
However, at the operating level, the subsidiary has made a profit of THB 8 million and so the Net Loss has come out only from finance costs on higher Debt taken to fund the development of the PPA Assets and once the Capital Structure is streamlined with a lower debt and larger Equity, these costs should reduce substantially. Further, taking into consideration the backdrop of the objectives of the Company to develop PPA Assets, the Company expects to generate more long-term returns.
During the first quarter of 2025, the Company’s same subsidy entered into a Credit facility agreement with a financial institution for an amount up to THB 370 million to secure funding for the investment in the PPA Assets.
For the year ended December 31, 2025, the subsidiary in Thailand engaged in high-end hotel and resort construction, CNDCM, reported total revenue of approximately THB 290 million and a net loss of THB 108 million. This was due to the revenue being at a low level, which was insufficient to cover the Company’s operational expenses. Another reason for the Loss is from the impact of Design Changes and Delays driven by Project owners, a large part of which may be recovered if ongoing negotiations with the owners are successfully concluded.
Comprehensive income
The total of other comprehensive income in the consolidated financial statements for 2025 increased by THB 18.7 million compared to 2024. However, the loss from changes in the fair value of equity investments designated at a fair value (net of deferred income tax) increased by THB 14.6 million, from a gain of THB 11.3 million in 2024 to a loss of THB 3.3 million in 2025. In 2025, the loss from actuarial loss (net of deferred income tax) decreased by THB 3.8 million compared to 2024, and there was a surplus from property revaluation (net of deferred income tax) of THB 30.1 million; as a result, the total other comprehensive income increased by THB 18.7 million.
Statements of Financial Position Analysis
As of December 31, 2025, the Company had total assets of THB 6,598.5 million, total liabilities of THB 4,845.7 million, and total shareholders’ equity of THB 1,752.8 million, as outlined below:
Assets
As of December 31, 2025, the Company’s total assets amounted to THB 6,598.5 million, an increase of THB 140.8 million or 2.2% from December 31, 2024. This was primarily driven by an increase in non-current assets of THB 237.5 million, while current assets decreased by THB 96.7 million, with details as follows:
The decrease in current assets of THB 96.7 million was mainly attributed to a THB 239.4 million decline in contract assets, resulting from project milestones being reached and subsequent invoicing. Additionally, advances to subcontractors decreased by THB 195.1 million as the Company utilized more of its in-house workforce for steel structure and fabrication works. However, trade and other receivables increased by THB 228.0 million in line with higher revenue recognition during the year, and inventories rose by THB 49.9 million compared to December 31, 2024.
The increase in non-current assets of THB 237.5 million was primarily due to a THB 191.9 million increase in other non-current assets, following the acquisition of a 12-rai land plot in Patong, Phuket, valued at THB 183 million. This investment aims to develop future real estate projects to enhance income-generating potential and asset value. Furthermore, property, plant, and equipment increased by THB 34.4 million, partly due to the revaluation of assets in accordance with accounting standards.
Aging construction contract receivables based on due dates are detailed below:
As of 2025, the Company had construction contract receivables amounting to THB 1,489 million, with 79.3% of the total receivables being either not yet due or overdue for no more than one month. The Company has established an allowance for doubtful accounts to account for expected losses from each receivable, considering past collection experience, the aging of outstanding debts, and the prevailing economic conditions. In 2025, the balance of allowance for doubtful accounts for loss of THB 30.6 million is unchanged, which is about 2% of the total construction contract debtors. However, the Company manages its risk by setting policies and procedures for controlling credit issuance. As a result, the Company does not anticipate significant losses from credit risk. Furthermore, the Company’s credit issuance is well-diversified, as it has a broad customer base and assesses customer credit worthiness before accepting new construction contracts.
Liabilities
As of December 31, 2025, the Company’s total liabilities stood at THB 4,845.7 million, representing an increase of THB 104.4 million or 2.2% from December 31, 2024. The key movements are as follows:
The increase was primarily driven by long-term loans, which rose by THB 172.7 million (as per the financial statements). This was due to borrowing by a subsidiary to fund the PPA Assets as explained above. Additionally, trade and other payables increased by THB 150.4 million, reflecting the growth in operational activities during the year.
Conversely, contract liabilities decreased by THB 288.4 million because of performance obligations being satisfied and revenue recognized based on project progress. Other liabilities also saw a reduction of THB 63.2 million compared to the end of 2024.
Shareholders’ equity
As of December 31, 2025, the Company’s total shareholders’ equity stood at THB 1,752.8 million, an increase of THB 36.4 million or 2.1% from December 31, 2024. This growth was primarily attributed to the net profit generated during the year. In the current period, the Company allocated a portion of its net profit to the legal reserve in the amount of THB 3.4 million. Furthermore, other components of equity rose by THB 24.0 million, mainly due to the surplus from property revaluation (net of deferred income tax), which was recognized as other comprehensive income during the year.
On the other hand, non-controlling interests decreased by THB 21.7 million compared to the end of 2024. This was primarily due to the operating loss of a subsidiary which reported a net loss of THB 108 million in 2025. Consequently, the share of total comprehensive loss attributable to the 20% non-controlling interest in this subsidiary led to the aforementioned decrease.
Cash Flow
Cash and cash equivalents as of the year ended 2025 accounted for THB 187.6 million, an increase of THB 57.7 million from the balance of THB 129.9 million at the end of 2024 or beginning of 2025.
Details of cash flow by activities are as follows:
Cash Flows from Operating Activities Net cash from operating activities amounted to THB 197.6 million. While this reflects a decrease compared to the previous year, the Company maintained a healthy positive cash flow through the effective collection of trade receivables from major projects and the receipt of tax refunds. These inflows ensured sufficient liquidity to support ongoing construction activities and operational obligations.
Cash Flows from Investing Activities Net cash used in investing activities was THB 284.2 million. The most significant transaction was the acquisition of land held for development, totalling THB 182.7 million, which aligns with the Company’s long-term strategic diversification and expansion plans. Other investing activities remained consistent with regular business cycles, involving routine asset acquisitions and disposals.
Cash Flows from Financing Activities Net cash from financing activities recorded an inflow of THB 145.1 million. The Company focused on optimizing its capital structure by balancing long-term loan drawdowns with regular monthly principal repayments of long-term loans. Additionally, the Company utilized cash proceeds from trade receivable collections to repay bank overdrafts and short-term loans, effectively reducing interest expenses and managing short-term financial liabilities. During the period, a dividend payment of THB 41.1 million was also distributed to shareholders.
Liquidity & Capital Adequacy
As of December 31, 2025, the Company’s average collection period shortened to 66.32 days, compared to 90.14 days in 2024. This improvement resulted from the settlement of a major receivable that had been long-overdue since mid-year; where the debtor was able to fulfil its payment obligations at the end of 2025 following financial support from its parent company. Meanwhile, the current ratio remained relatively stable at 0.91 times, compared to 0.92 times at the end of 2024.
Regarding the financial structure, the debt-to-equity ratio stood at 2.76 times, remaining unchanged from 2024. However, the interest-bearing debt to equity ratio increased from 0.50 times at the end of 2024 to 0.61 times in 2025. This increase was primarily driven by long-term borrowings from financial institutions by a subsidiary to fund investments in equipment and the installation of solar power generation systems for customers under Power Purchase Agreements (Solar PPA) as explained above.
Furthermore, the Interest Coverage Ratio improved significantly to 3.60 times, up from 2.60 times at the end of 2024. This improvement was driven by the Group’s enhanced efficiency in managing interest expenses, particularly at the parent company level where interest costs decreased through effective capital structure management.
The Debt Service Coverage Ratio (DSCR) also strengthened to 1.99 times, compared to 1.11 times at the end of 2024. This calculation focuses on the Group's ability to service the current portion of long-term loans and interest expenses. Although there was an increase in short-term loans vide promissory notes (P/N) utilized for working capital purposes, the Group’s robust cash flow from operations ensures a strong debt-servicing capacity that remains well above the financial covenants required by financial institutions.
Asset Management Capability
In 2025, the Company’s Return on Assets (ROA) was 0.86%, an increase from 0.57% in 2024.
Meanwhile, the Return on Fixed Assets increased from 6.96% in 2024 to 7.55% in 2025. The Asset Turnover Ratio stood at 1.14 times, up from 0.95 times in 2024. This reflects improved asset utilization, which is a priority for the Company to ensure maximum efficiency in asset management to support future operations.
Debt Obligations & Off-Balance-Sheet Management
As at 31 December 2025, the Group had commitments in respect of subcontractor agreements payable in the future of approximately Baht 5,500 million (2024: Baht 4,076 million) (the Company only: Baht 5,397 million (2024: Baht 4,003 million)).
Guarantees
As at 31 December 2025, the Group had issued letters of guarantees of approximately Baht 250 million (2024: Baht 49 million), mainly in respect of contractual performance and advance payments.
There were outstanding bank guarantees issued by banks on behalf of the Group in respect of certain performance bonds as required in the normal course of business of the Group. In 2025, the Group’s total bank guarantees amounted to Baht 3,712 million, a decrease from Baht 4,209 million in 2024, with key details as follows:
Advances:Baht 1,728 million (increased from Baht 1,632 million in 2024)
Contractual performance:Baht 1,115 million (decreased from Baht 1,691 million)
Retention:Baht 125 million (increased from Baht 179 million)
Payments due to creditors:Baht 100 million (decreased from Baht 116 million)
Tax refund:Baht 567 million (slightly decreased from 2024)
Overall, the Group’s bank guarantee obligations have shown an increasing trend from the previous year, primarily driven by an increase in guarantees for advances and contractual performance.
Furthermore, the Company issued letters of guarantee to a subsidiary’s financial institution to guarantee credit limit of bank overdraft, short-term loan, letters of guarantees, promissory notes, credit instruments, credit for import and export on behalf of its subsidiary totaling Baht 823 million (2024: Baht 453 million).
Debt Securities with Financial Ratio Requirements
Debt Securities with Financial Ratio Requirements Issued?
No
Factors That May Affect Financial Condition
Factors or Incidents That May Materially Affect Financial Condition
The Company faces both opportunities and challenges in its future operations. The Company has opportunities for growth from various positive factors such as investments in new industries, the recovery of the tourism sector, and the promotion of clean energy. However, the Company also faces challenges from various risk factors such as economic and policy uncertainties, increased competition, and the overall sluggishness of the construction industry. The Company must be able to adapt and capitalize on the opportunities while also effectively managing these risks in order to achieve sustainable growth in the future.